Trimley Station

Introduction
Project Trimley Station was the upgrade of lighting to the station platform, car park, and pedestrian footbridge. We (Coljoint) worked closely with our client, the KN Group to upgrade the lighting system throughout these areas by installing SWA Cables in buried cable ducting within the car park and station platform. We installed a 50x50mm Galvanised trunking across the pedestrian footbridge to allow us to get the cables to each light. This was powder coated green to blend in with the bridge. We then fitted the anti-vandal light fittings to the underneath of this trunking. Anti tamper fixings were installed to the trunking lid & footbridge lighting to protect from vandalization & theft. A new DNO cabinet & a new supply cabinet were installed which were designed and fitted out by Coljoint.
Client Brief
The KN Group instructed Coljoint to complete the installation of a new DNO cabinet situated in the newly upgraded car park, which then feeds a new supply cabinet which houses a new distribution board & lighting control system. The distribution board was to then feed the outgoing lighting circuits installed to the station platform, car park & pedestrian footbridge.
Project Delivery
- 16no 5m hinged lampposts were installed to provide lighting to the station platform, carpark, and pedestrian walkways,
- 16no Lucy cutouts have been installed to all lampposts for easy isolation of the lamppost flood lights.
- New presence detection emergency floodlights were installed to each of the 16no 5m lampposts on the station platform, carpark & pedestrian walkways. These energy efficient lights are designed to be dim and then brighten up when a presence is detected on the platform, carpark & pedestrian walkways.
- 18no Vandal proof LED light fittings have been installed on the pedestrian footbridge.
- 36m 50x50mm galvanized trunking was installed to protect the cables on the footbridge, this was sent off to be powder coated green to blend in with the footbridge.
- A new feeder cabinet to house the new distribution board & lighting control system for the new circuits.
- A new DNO cabinet to supply the new feeder cabinet on the platform.
Project Duration
8 Months
Project Cost
£143k
Materials
Quinshield GRP feeder pillar cabinet, galvanised trunking & tray, powder coated trunking, Abacus hinged light columns, Lucy Zion lamp post cutouts, Dexeco light fittings, Schneider distribution board, contactors, RCBOs & MCBs, XLPE SWA, LSF single core cables, Eaton Switch fused isolators, MK Metal clad sockets, switches & spurs, Prysmian Bicon glands.