Maycroft is a large domestic house refurbishment, double side & single rear extension, along with a coach house at the bottom of the garden in Kent. The house was stripped back to bare brick & had all the floors ripped up to give all services access for services. We also installed external lighting supplies to an outside cupboard for all the outgoing lighting cables situated all around the garden, pond, and flowerbeds. All the lighting in the house, coach house & garden are controlled via the Rako lighting systems.

Client Brief

Coljoint was instructed by the private client to complete the full electrical installation of power, data, TV & lighting, along with a Rako smart lighting system to the house & coach house. We installed a CMS throughout the ground & 1st floors to allow the cables to reach their destinations around the house. We had to run a new SWA sub main cable from the house distribution board up to the coach house through buried cable ducting which also runs under the new concrete floor on the ground floor. We worked closely with the builders & the kitchen designers/installers to make sure the project run smoothly and was completed on time. The down/up lighters were supplied by Malissa Lighting.

 

Project Delivery

  • LED downlights were installed throughout.
  • LED up lights were installed in the ground floor kitchen & dining rooms entrances and full height kitchen windows.
  • LED strip lights, profiles & lids were installed around the lounge ceiling lantern window.
  • Flat plate switches, sockets, data & TV were installed throughout.
  • CMS was installed throughout the ground & 1st
  • Rako wired lighting system was installed in the house & coach house.
  • A new Hager 12-way TPN distribution board was installed in the basement near the existing incoming supply. All circuits fully tested into service.
  • A new Hager 6-way TPN distribution board was installed in the intake room at the coach house. All circuits tested into service.
  • A new data cabinet was installed in the basement with all CAT 6 data cables terminated & tested into service.
  • A new data cabinet was installed in the intake room in the coach house, all CAT 6 cables terminated & tested into service.
  • External lighting installed in the garden, in the flowerbeds, around the newly constructed pond, & on the large pillars at the entrance to the grounds.

 

 

Project Duration

12 months

 

Project Cost

£68k

Materials / Technology

SWA cable, Twin & earth cable, 2&3 core flexible cables, Cat 6 cables, LED strip lights with profiles & opal lid, LED downlights & up lights, Click Definity sockets, fused connection points & data points, Rako wired lighting control system.